Accomodation Polcevera Foce – Genoa

Accomodation Polcevera Foce – Genoa

Accomodation Polcevera Foce – Genoa Executive project of arrangement of the Polcevera Torrent (Settlement tank) – Port of Genoa Goal of the project: Planning of the participations of hydraulic adaptation of the terminal section of the polcevera torrent...
Pier of di Punta Cugno – Sicily

Pier of di Punta Cugno – Sicily

Pier of di Punta Cugno – Sicily Final design of the interventions for functional restoration to Pier of  Punta Cugno – Port of Augusta Goal of the project: Technical – economic analysis for chosing the optimal solutions and final design of structural...
Marghera Port

Marghera Port

Marghera Port Safety work of the industrial channel south of Marghera Port, pontile executive project Goal of the project: Preliminary and excutive design of restoration interventions to port berth of the oil terminal in the within of the intense activities of putting...
Oil Terminal

Oil Terminal

Oil Terminal OIL TERMINAL Work to ensure safety of the industrial channel south of Marghera Port executive pontile plan Goal of the project:  Preliminary and executive design of restoration interventions of the functionality of the harbour dock of the oil terminal in...
Arrangement of Slopes

Arrangement of Slopes

Arrangement of Slopes ARRAGEMENT OF SLOPES Coastal Oil Terminal in Panama: Executive planning of the slope for hydrogeological risk mitigation Goal of the project: Detailed engineering design and supervision of works for the realization of a system of drainage of the...